HYDROMECH has successfully executed a 50kW Hydropower project at the Kaigah site in Dassu, KPK for CGCC. This project included Design, Supply, Procurement, Manufacturing, Layout, Installation, Testing, and Commissioning of all required hydropower machinery and equipment. HYDROMECH completed this project efficiently within the scheduled time frame.
Copyright © 2021 Hydromech Engineering Equipment Company. All rights reserved.